St. Thomas Aquinas Catholic Secondary School
Frank J. Hayden Secondary School
Haber Recreation Centre
PROJECT FEATURES
- 3 - Storey @ 141,071 sq. ft. (13, 106 sq. m.) Gross Floor Area
- 1250 Student capacity
- Construction start October 2011
- Occupancy September 2013
- Artificial Turf Sports Field c/w 8 lane, rubber surfaced running track and 650+ seat capacity
- 16 acre site with 310+ car parking capacity with dedicated bus drop-off and pick up zones
- Sustainable energy design features: 'Termobuild' radiant energy system for heating and cooling utilizing precast concrete slab and hollow cores plus light harvesting
ACADEMIC FEATURES
- Full wireless access
- Smart Boards in all classrooms
- Combined Library Resource Centre with Community Library c/w
- 'Hangout For'em'
SPECIAL PROGRAM FEATURES
- 3 oversized gymnasiums designed for provincial competitions by combining 5 additional 'shared use' opportunities with Haber Recreation Centre c/w retractable seating for 600
- 8 Sports Change Rooms
- 350 seat theatre c/w lighting and ancillary production spaces
- Cardinal corridor with connection bridge
- Cafeteria with Café-style Servery and Outdoor Patio
- 2 Music Rooms with Vocal and Instrumental practice booths
- Dance Studio
- Cosmetology Salon
- Healthcare Classroom
- Drama Room
- Fitness and Weight Rooms
- 2 Art Rooms & Galleria shared with Recreation Centre
- Construction, Transportation, Robotics and Manufacturing Tech Shops
- Family Study, Food and Textile Classrooms
- Design and Computer Labs
Bishop Ryan Catholic Secondary School
PROJECT FEATURES
- 2 – Storey @ 191,550 sq. ft. (17,795 sq.m.) Gross Floor Area
- 1455 Student capacity
- Construction start March 2012
- Occupancy: January 2014
- Artificial Turf Sports Field c/w 8 lane, rubber surfaced, running track, sports field lighting and 1000 seat capacity Terrace Seating with elevated Press Box
- 18 acre site with 330 car parking capacity with dedicated bus drop off and pick up zones
ACADEMIC FEATURES
- Full wireless access
- Smart Boards in all classrooms
- ‘College Style’ Library Resource Centre
- Press Box integrated into 2nd floor of the school
SPECIAL PROGRAM FEATURES
- 600 seat Theatre Auditorium
- 120 seat capacity Chapel
- Cathedral like Forum and Theatre Lobby
- 3 Gymnasiums with 434 Spectator seating
- 8 Sports Change Rooms
- Cafeteria with Café-style Servery, Outdoor Patio & Vegetable Garden
- 2 Music Rooms with Practice Studios
- Dance Studio
- Cosmetology Salon
- Healthcare Classroom
- Drama Room
- Fitness and Weight Rooms
- Art Centre with 2 Art Rooms and Rooftop Studio
- Construction, Transportation and Manufacturing Tech Shops
- Family Study, Food and Textile Classrooms
- Design and Computer Labs
St. Thomas More Catholic Secondary School (Classroom Addition)
PROJECT FEATURES
- 2 – Storey @ 25,930 sq. ft. (2,409 sq.m.) Gross Floor Area
- 15 classroom addition to reduce site portables and increase on site parking by 100 spaces
- Construction start: December 2012
- Occupancy: September 2013
- Artificial Turf Sports Field c/w sports field lighting and 715 seat capacity aluminum bleachers with elevated Press Box.
- New Pedestrian and Vehicular site approach to revitalized front entrance
- General enhancements to school image
ACADEMIC FEATURES
- Full wireless access
- Smart Boards in all classrooms
- Multi-use School and Community Classroom at front entrance
- New lobby featuring hi tech information display
PDF - St. Thomas More Catholic Secondary School Proposal
Alton Public Library
(In Partnership with City of Burlington (Haber Recreation Centre) and Halton District School Board (Frank J. Hayden Secondary School)